Boutique hotel furniture suppliers, from the guestroom to the lobby.
Italcasa Design supplies hotel furniture, lighting and FF&E to boutique hotels, inns and guest houses. We are an authorized dealer for the top Italian and European houses and a design studio: we order direct, import, check, warehouse and install. Send a room list or a specification and we quote it line by line.
- Per keyGuestroom packages are quoted, ordered and installed per key, the trade's word for one guest room.
- 12–16 weeksTypical factory time for made-to-order pieces. The written quote confirms it for each piece.
- Since 1985An authorized dealer and design studio with two Metro Detroit showrooms.
- Per keyGuestroom packages are quoted, ordered and installed per key, the trade's word for one guest room.
- 12–16 weeksTypical factory time for made-to-order pieces. The written quote confirms it for each piece.
- Since 1985An authorized dealer and design studio with two Metro Detroit showrooms.
- We quote from a room list: the number of keys, the room types and a date.
- Mirrors, rugs and lights travel on the same order as the furniture.
- Contract grade is not one certificate: ask for the seating, fabric and flammability test reports piece by piece.
- Product pages link the maker's spec sheet where one exists, and take CAD or BIM requests where files are available.
Hotel furniture by room, from houses with hotels to show.
Hotel FF&E means furniture, fixtures and equipment: everything in a hotel that is not the building. For a guestroom that is the bed, nightstands, desk, chair, wardrobe, mirror and lights. Linens, towels and other operating supplies, called OS&E, are a separate purchase.
Guestrooms
Pianca makes wardrobes, beds and nightstands. It furnished all 164 rooms of the Hotel Sinclair in Fort Worth with custom-made furniture. Lago's contract unit adjusts materials, dimensions and configuration to each project.
ViewLobby and lounge seating
Moroso's hospitality projects include the Watergate Hotel in Washington and the W South Beach in Miami. Natuzzi Italia's Projects Division lists hospitality among its fields.
ViewRestaurant and bar
Dining chairs, bar stools and tables from Emeco, LaPalma, Connubia and Calligaris.
ViewTerrace and pool deck
Talenti makes teak and aluminum sofas, sunbeds and daybeds, and furnished the pool, garden and bar of the Grand Hotel Victoria on Lake Como. We also supply Vondom, from Valencia.
ViewGuestroom and lobby lighting
Flos, Foscarini, Marset and Vibia, each in the version the house makes for the North American market. Marset publishes its hotel projects. Vibia lit the Palazzo Balsamo boutique hotel in Palermo.
View
Contract grade for hotels, and the test reports to ask for.
Contract grade means furniture made and tested for public rooms, not homes. No single certificate carries the name, so ask each maker for the test report. ANSI/BIFMA X5.4 covers public and lounge seating, X5.5 desks and tables, X5.9 storage units. For fabric, the Association for Contract Textiles sets 30,000 Wyzenbeek double rubs or 40,000 Martindale cycles for public spaces. For upholstery, California's TB 117-2013 smolder test has been the federal standard since June 25, 2021.

Custom hotel furniture, made to order by the house.
Custom hotel furniture is custom made by the house, in the wood, lacquer, fabric and leather you choose from its range. For custom guestroom furniture, Pianca can change the length, height and depth of certain products. For bespoke furniture for hotels, Reflex works in custom measurements, materials and finishes, up to a complete hotel.

From your room list to the last installed floor.
As hotel room furniture suppliers we quote from three things: the room count by type, a plan and a date. Send your designer's specification if one exists, or ask us to write it. One designer and one project manager stay on the property throughout.
Specify
Line by line and per key, with finish samples and the maker's spec sheet where one exists.
Quote
The price, the freight and the lead time for each piece, in writing, before any deposit.
Order and check
Ordered direct. Most pieces typically ship from the factory in 12–16 weeks, then are checked in our warehouse.
Install
Floor by floor around occupancy, with the list of small fixes closed on each floor.
Inns, motels and guest houses, supplied the same way.
Motel furnishings and guest house furniture come from the same houses as a hotel order: beds, nightstands, a chair, a desk and lights that take daily use. Bring the room count and a floor plan to our Royal Oak, MI showroom, or send them.
- 01Number of keys and the room types: king, double, suite, accessible
- 02Floor plans, or one typical room with its dimensions
- 03Your FF&E specification or designer's schedule, if one exists
- 04New opening or renovation, and whether floors stay occupied
- 05Opening date, or the date the rooms must be back in use
- 06The brand standard, if the property carries a flag
Good to know, before you ask.
Who supplies guestroom lighting for hotel FF&E packages?
Do you supply custom made hotel furniture?
Which Italian houses make luxury hotel furniture?
What is the lead time for boutique hotel furniture?
Do you supply hotel furniture outside Michigan?
- Hotel interior design and FF&E specification
- Restaurant furniture and FF&E supply
- Custom Italian furniture
- Contract-grade furniture
- Wardrobes and armoires
- Italian armchairs
- Outdoor daybeds
- Wall lights
- Commercial interior design
- Trade program for designers
- Delivery and installation
- Guide to the Italian furniture houses
Send the keys and the room types. We quote it line by line.
Send the number of keys, the room types and the date. Attach a floor plan or your specification if you have one.